Continued Mold building process of the “optional extension” for the Flat Marker.
With the ring repaired, it was being prepared for gelcoat spraying, by taping off the area not to be sprayed.
The color pink was chosen because it would make the manufacturing process easier, and we would possibly never make a pink memorial.
The project so far took 40 hours of work .